The topic of this thesis is detailed design of supporting structure of continous box girder bridge across a deep valley called Lazný creek. The bridge have to pass the second class road with category S 9,5. The design is processed by two options. The chosen option is designed as a girder with five spans 44,8 m + 55 m + 55 m + 55 m +44,8 m. Total length of bridge is 268,57 m, the main girder is gradually cast into the formwork suspended on a special ceiling scaffolding. The axis of the bridge is in a plan straight with the constant transversal slope 2,5 %. The thesis contains six models in software SCIA ENGINEER. Part of the work is situated on time depended analysis with construction phases. Assesment of ultimate limit states and serviceability limit states were done by hand according to the valid standards and regulations. Structural analysis, drawing documentation and vizualization are parts of this work.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:455419 |
Date | January 2022 |
Creators | Hajnoš, Mário |
Contributors | Páleník, Petr, Koláček, Jan |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Slovak |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0025 seconds