This degree project aims to investigate whether it is possible to establish photovoltaic (PV) systems inexisting Swedish wind farms from a production and permit perspective. The degree project examinesthe conditions for the establishment of PV systems in three wind farms owned by Eolus Vind AB. The results show the importance of investigating the prerequisites of the location to find the rightproject site for PV power plants. In addition, the results show that Swedish laws do not oppose PVpower plants being built in wind farms. The production calculations also show that a more evenelectricity power production is achieved when PV systems are installed on open areas in the windfarms, but that the proportion of installed power will be limited by the connection points within eachwind farm. The conclusion is that wind farms are suitable with a combination of solar and wind power, but theconnection point will be a major factor in the amount of installed solar power that can be added to theproject areas.
Identifer | oai:union.ndltd.org:UPSALLA1/oai:DiVA.org:hh-44524 |
Date | January 2021 |
Creators | Nilsson, Emelie |
Publisher | Högskolan i Halmstad, Akademin för företagande, innovation och hållbarhet, Halmstad Högskola |
Source Sets | DiVA Archive at Upsalla University |
Language | Swedish |
Detected Language | English |
Type | Student thesis, info:eu-repo/semantics/bachelorThesis, text |
Format | application/pdf |
Rights | info:eu-repo/semantics/openAccess |
Page generated in 0.0016 seconds