Innovative methodology for location-based scheduling and visualisation of earthworks in road construction projects

This thesis focuses on the development of an innovative location-based scheduling methodology and a computer-based model for improving earthwork operations in road construction projects. Analysis of existing planning and scheduling practices in road construction projects conducted in the course of this research concluded that planning, scheduling and resource allocation are largely dependent on subjective decisions. Also, shortcomings exist due to the distinct characteristics of earthworks, e.g. one-off projects with uncertain site conditions and soil characteristics, causing delays and cost overruns of projects. The literature review found that existing linear scheduling methods provide inaccurate location-based information about earthworks and fail to integrate different productivity rates. A survey was used to capture and analyse industrial practices and issues related to delays and cost overruns. This analysis revealed that the accurate location-based information is vital for efficient resource planning and progress monitoring. Following these findings, a theoretical framework and specification were developed to automate location-based scheduling and visualisation of information. A prototype model was developed by integrating road design data, sectional quantities, productivity rates, unit cost, site access points, and arithmetic algorithms. The algorithms underpinning the model enable the generation of time-location plans automatically as a key output of the model. Weekly progress profiles, space congestion plans, and cost S-curves are the other outputs. A cut-fill algorithm was developed to identify optimum quantities of earthwork and its associated costs. Experiments were conducted with design data provided by a road construction company to demonstrate the model‟s functionality. Sensitivity analysis was used to identify the critical factors relating to earthwork scheduling. It was found that the model is capable of generating time-location plans, considering the critical factors and location aspects. Finally, the model was evaluated using a case study and validated by road construction professionals using an indirect comparison method. It was concluded that the model is a valuable tool for producing location-based scheduling, optimising resource planning and assisting in the communication of scheduling information from the location viewpoints in the earthwork projects.

Identiferoai:union.ndltd.org:bl.uk/oai:ethos.bl.uk:547294
Date January 2011
CreatorsShah, Raj K.
ContributorsDawood, Nashwan N. : Dean, John T. : Castro, Serafim
PublisherTeesside University
Source SetsEthos UK
Detected LanguageEnglish
TypeElectronic Thesis or Dissertation
Sourcehttp://hdl.handle.net/10149/194590

Page generated in 0.0019 seconds