This thesis deals with the reconstruction of the existing road arch bridge using free transverse prestressing cables. Cables are laid in holes drilled in the shape of strut. The holes routed diagonally across the front wall of the bottom edge of the arch. The work also includes the stability of long front wall. This is solved by means of spacer frames led across the road. The reconstruction can be done partially limited service.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:226960 |
Date | January 2014 |
Creators | Klecandrová, Jana |
Contributors | Krejčík, Vladimír, Klusáček, Ladislav |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0022 seconds