The aim of this Master’s thesis is the design and reconstruction of the high voltage distribution network for the company E. ON with focus on calculation of the stabilized operation and on the planning of new cable taps from the transformer substation Moravany u Brna. The first part of the theoretical analysis of the work deals with the inclusion of the distribution network into the power system and with principles of development and construction of high voltage networks. The second part includes a general calculation of stabilized operation of the power distribution network and a familiarization with the program PAS Off - Line Bison 4.0. The practical part of the thesis is focused on the calculation of the stabilized operation at the current state of transformer substation Moravany u Brna using the PAS Off - Line Bizon 4.0 V programme. This part also contains the design of six new cable lines which are needed to strengthen the power distribution in the southern part of the city Brno. The closing part of this chapter constitutes of a outdoor and indoor cable line renovation. These cables are connected to the transformer substation Moravany u Brna and a calculation of stabilized operation is also included in this part.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:220293 |
Date | January 2013 |
Creators | Chromík, Aleš |
Contributors | Beneš, Jan, Blažek, Vladimír |
Publisher | Vysoké učení technické v Brně. Fakulta elektrotechniky a komunikačních technologií |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0015 seconds