This master’s thesis is divided into two logical parts. The first part contains theory of calculation of steady state and short-circuits conditions within 110 kV distribution network. Newton’s method and short-circuit current calculation is also explained here. It also deals with classification and aftereffects of transient performance occurring in power networks. The second part contains practical calculation of steady flow and short-circuit conditions at parallel operation of transformers T403 and T402 in 400/110 kV transformer stations Sokolnice and Otrokovice. This calculation is done with program used by system operators called SINAUT Spectrum and consequently analyzed. This part also contains brief description of substations from this region.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:220936 |
Date | January 2014 |
Creators | Doležal, Marek |
Contributors | Foltýn,, Daniel, Blažek, Vladimír |
Publisher | Vysoké učení technické v Brně. Fakulta elektrotechniky a komunikačních technologií |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.002 seconds