Return to search

Retrofit parní turbiny 250 MW na biomasu / Biomass Retrofit 250 MW Steam Turbine

There is a description of modernisation steam condensing turbine in this Master´s thesis. Electric output is decreased from 250 MW to 160 MW. This thesis is divided into two parts, there is a calculation of heat balance in first part and a calculation of blading in second part. Detail drawing and heat balance are the most important results of this Master´s thesis.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:230569
Date January 2013
CreatorsNovák, Martin
ContributorsJosef, Švagr, Josef, Švagr, Fiedler, Jan
PublisherVysoké učení technické v Brně. Fakulta strojního inženýrství
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0014 seconds