This thesis is focused on calculation of double casing condensing steam turbine with capacity 200 MW for petrochemical industry´s consumptions. Engine is projected for gas-steam cycle. It has one controlled extraction points placed between two bodies, two uncontrolled extraction points and axial output to air-cooling condenser. Balance scheme was made for 100% operation. Detail design is made only for ST/NT casing and it includes calculation of flowing part, selection of blade´s profile and its stress control. Rotor is checked for critical speed, safety rigid coupling is calculated and according to reaction forces journal bearing are designed. In the end regulation of turbo-set is discussed more precisely and there are calculation of temperature and pressure in uncontrolled extraction points during 80% and 60% operation. Thesis was written out according to Doosan Skoda Power´s instruction and with their cooperation.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:230759 |
Date | January 2013 |
Creators | Adámek, Tomáš |
Contributors | Richard, Fichtl, Fiedler, Jan |
Publisher | Vysoké učení technické v Brně. Fakulta strojního inženýrství |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0017 seconds