This master thesis contents alternative design of three spans single-railed steel bridge and its main bearing structures. The bridge is located in km 19,459 on the track Děčín - Oldřichov. Crossing barrier is highway D8. The span is 28,38 m + 41,28 m + 28,38 m. The main bearing structure consists of solid steel beams with variable height of 2,3 m ~ 3,8 m, which are in the axial distance of 6 meters and reinforced with lengthwise and transverse stiffeners. The lower bridge deck with a continuous ballast bed consists of reinforced concrete bath, which is coupled with steel cross beams. All elements of the structure are made out of steel S 355. For design of the following standards have been used: ČSN EN 1991-2, ČSN EN 1993, ČSN EN 1994 – 2.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:226050 |
Date | January 2013 |
Creators | Bilík, Ondřej |
Contributors | Marván, David, Nečesal, Petr |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.002 seconds