The design of reconstruction of railway stations Šternberk and Bohuňovice comprises the proposal to increase the line speed of the main track to the maximum possible value, the design of station tracks and reconstruction of railway switches and crossings, the design of the new platforms, which implements the requirements for people with reduced mobility and the design of new drainage system. Next, the design of reconstruction comprises the design of the railway superstructure and substructure and the design of railway level crossings.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:265544 |
Date | January 2017 |
Creators | Šatánek, Jan |
Contributors | Brůha, Bohuslav, Plášek, Otto |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0015 seconds