The aim of this thesis is to create a comprehensive system of logistics management in processes of hotel building with a focus on the optimization of material and information flows with respect to the time schedule of construction and focusing on achieving savings in logistical costs. The operational objective will be to determine the amount of the construction schedule based on the identification of individual phases of the project. Second partial objective will be to analyze the availability and price levels of different types of building materials and the subsequent choice of a suitable purchase locations with an emphasis on logistics management structure. Mainly important will be the optimal cost of transporting the material to the place of building and the timely availability of the optimal quantity and quality. The thesis deals with construction of middle-sized hotel facility in Monte Negro, Drobni Pijesak beach. Firstly, it was managed to determine the construction schedule in accordance with the requirements of the investor company to finish the building till the end of 2014. Secondly was created a plan of resource purchasing in order to keep the costs as low as possible without lowering the quality of construction. The main aim was in keeping the transportation costs in reasonable amounts together with analysis of the price levels in Monte Negro its neighbor countries and in the Czech republic. The total budget of the project was determined to be around 28 702 600 Kč. Because of price level and currency instability there was included a 10 % reserve, which makes total building costs exactly 31 572 860 Kč.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:153607 |
Date | January 2013 |
Creators | NOVÁK, Martin |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0019 seconds