This thesis describes the design of steel structures footbridge over the track in Havířov. The total length of the bridge is 101.6 m footbridge consists of four parts. The basic structural system of the first part of the beam is solidified arc. Other parts are made girders. Free bridge width is 3.2 m Footbridge will be used to connect local area Havířov - Šumbark to the train station.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:226079 |
Date | January 2013 |
Creators | Mojžíš, Jan |
Contributors | Sýkora, Karel, Puchner, Josef |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.002 seconds