The result of this work will be design the reconstruction of the railway station Ostružná and Horní Lipová to fulfil the following conditions. It must be ensured smooth movement of persons with reduced mobility in the sense amended by Decree 398/2009 Coll., also endeavor will be made an extension length of the platforms and useful length of the tracks, edit directional and height parameters to the requirements of the current standards and the associated construction of a functional drainage. However, it is avoiding the extensive work to minimize investment.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:226631 |
Date | January 2014 |
Creators | Látal, Jan |
Contributors | Bubníková, Dana, Svoboda, Richard |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0016 seconds