Return to search

Architektonická studie nábřeží v Trenčíně / Architectural Study of the Waterfront in Trencin

In 2005, city council approved the addition to the city of Trenčín town planning scheme, which deals with the modernization of the railway line. preparatory work is already underway related to the transhipment of the line, the process of modernization will be conducted for several years and will greatly affect the city center. There is the possibility of extending the center to the river. I saw a couple of designs and it is clear that the city sees an opportunity in the influx of investment and capital in the area, the possibility of new attractive commercial zone. I dealt with the reconstruction of the center and the quay in my last semester work entitled Trenčín 2020 - Quay and study center. Trenčín needs more cultural institutions or green instead of other commercial and administrative areas. Trencin is also missing theater building, performances in the present operate within the alternative scene in so called House of army. So i chose the space generated by moving the rail as the location for the new municipal theater and I decided to continue to work on this during the course of the diploma work. I propose theatre as part of the Center of Performing Arts (rather popular topic these days) and i added the alternative arena and a small concert hall on the both sides of theatre, creating a center which could become a decent space for cultural activities for important regional city. Instead of green which would be reduced on the riverbank I proposed green park located in front the cultural center (at the place where today lies vast parking and local train tracks - i dealt with this issue in my previous work), which creates a natural barrier against a relatively busy road in the center. So during the last semester I have already declared the location of the theatre , I have known about the possible access roads, perspectives, problems... Then I started to shape a mass of the building - inspired by the way of work by young Danish architects - I drew a rectangular block and began to form it under the influence of surrounding elements, or limits. So began the erecion of sharp "nose" over the river, which provides a view from the foyer and cafes located on the highest floor. Same nose is on the reverse side of the building facing the city's historic center and the castle, which helps me to extends the area needed for administrative support of theater. Because of the significant design of the foyer the building is extending towards the river and on both sides there are ramps which makes roof accesible for everyone to enjoy the view. At the end the building started to look like a ship stranded on the shore, with desire to reach the water again and sail into the unknown. The basic scheme of the building is divided into three main volumes: the foyer - scene - administrative and warehouse section. Enter the foyer from the river side, walk into the light, the stage is directly connected, and partly surrounded by storage. On the higher floors of the foyer is a music café with a view on the river on the other side of the theater scene are storage spaces are the actors' dressing rooms and administrative department.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:215612
Date January 2009
CreatorsAndel, Branislav
ContributorsUrbášková, Hana, Šindlar, Jiljí
PublisherVysoké učení technické v Brně. Fakulta architektury
Source SetsCzech ETDs
LanguageSlovak
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0019 seconds