The thesis deals with design of the tram power collecting route and the tram track of the route no. 3 in reconstruction area recently called “Zbrojovka Brno”. Connection to the present infrastructure is also considered. Housing, resting, administration sectors and tram stops are designed for easy availability in the new area. Because the railroad bounds the area on the East and will be extended in the future, joining the tram transport with integrated transport system in Židenice is possible. Design includes the new bridge across Svitava river and connection with surrounding areas. If we divide individual car transport (IAD) from the tram route, the trolley car transportation is designed in place IAD.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:225929 |
Date | January 2013 |
Creators | Paszandová, Zuzana |
Contributors | Veselý, Josef, Pavlíček, Jan |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0015 seconds