The thesis work has been carried out at Volvo Aero Corporation (VAC) in Trollhättan. VAC has entered a partnership as developing and producing partner with engine manufacturer Pratt & Whitney and is currently at the starting phase of producing the turbine rear frame (TEC) to the engine PW1000.The purpose of this study was to create a report on process level that describes the conditions and the potential with PW1000 TEC to reach the product cost calculation taking into account lead times and describe alternative method solutions.The report describes a comparison between the present flow (2012), a flow based on product cost calculation (2016) and a potential flow (2016). The work has mainly been based on acquiring the knowledge and information available to inspect the present flow; this has been done by workshop observations, meetings and gathering of the information that is available on the work site for the PW1000 TEC.The information obtained has been merged into an Excel document, called Roadmap. It serves as a roadmap with current situation as the start and the potential flow for 2016 as the goal. With the roadmap as a tool, assumptions have been taken considering the flow and how it will change, where processes have been eliminated, reduced or marked as a problem.
Identifer | oai:union.ndltd.org:UPSALLA1/oai:DiVA.org:oru-23645 |
Date | January 2012 |
Creators | Hjalmarsson, Olovsson, Hampus, Jörgen |
Publisher | Örebro universitet, Institutionen för naturvetenskap och teknik |
Source Sets | DiVA Archive at Upsalla University |
Language | Swedish |
Detected Language | English |
Type | Student thesis, info:eu-repo/semantics/bachelorThesis, text |
Format | application/pdf |
Rights | info:eu-repo/semantics/openAccess |
Page generated in 0.0615 seconds