The secondary control must be part of the production plan, since the capacity will bedeployed in advance, just as the primary control. The activation of the new frequencycontrol should be preformed in Vattenfall's operations centers (DC) to minimizecommunication delay. Vattenfall needs to work towards a more holistic optimizationsystem. The main issue for Vattenfall Generation is not how we produce but ratherwhen, which is done with creation of bids. This is where there is the mostopportunity for improvement. A new type of frequency control will be introduced onthe Nordic electricity market with the purpose of relieving the primary control. It willserve as a link between today's primary control and secondary control.
Identifer | oai:union.ndltd.org:UPSALLA1/oai:DiVA.org:uu-134290 |
Date | January 2010 |
Creators | Lindström, Gustav |
Publisher | Uppsala universitet, Elektricitetslära |
Source Sets | DiVA Archive at Upsalla University |
Language | Swedish |
Detected Language | English |
Type | Student thesis, info:eu-repo/semantics/bachelorThesis, text |
Format | application/pdf |
Rights | info:eu-repo/semantics/openAccess |
Relation | UPTEC F, 1401-5757 ; F10060 |
Page generated in 0.0016 seconds