Return to search

Vyhodnocení účinnosti čistírny odpadních vod v Lipníku nad Bečvou

The thesis "Evaluation of the effectiveness of the wastewater treatment plant in Lipník nad Bečvou" compares the effectiveness of wastewater treatment before and after the plant reconstruction. This work is comprised of the theoretical and practical part. The theoretical part applies overview of the water law legislation, sewerage, types of wastewater and concrete methods of wastewater treatment. The practical part is focused on wastewater treatment in the city. Included is the transport of wastewater, description of treatment technology before and after plant reconstruction. Follows the graphical results of wastewater treatment plant load, analytic wastewater checks and effectiveness of the WTP (Wastewater Treatment Plant) in years 2005 and 2015. The results show that the original wastewater treatment technology was, according to compliance with the emission standards, insufficient. For this reason, complete WTP reconstruction followed. From the current WTP results, it is evident that the hydraulic load is at 50 % average, but it is overloaded with the substance. Despite this fact, WTP maintains its high effectiveness in pollution elimination. The levels of pollution on the WTP output do not exceed the values of the emission standards and limits.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:430228
Date January 2017
CreatorsMasařová, Markéta
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0065 seconds