Return to search

Studie proveditelnosti průtočné MVE / Feasibility study of the small hydropower station

The aim of the present master’s thesis is to explore the feasibility of small hydropower plant for cur-rent hydro energetic potential of the weir on Ohře river, located in the city of Terezín in Ústecký re-gion, Czech Republic. The target of the thesis itself was to design minimally two variants of constructional and technological part. Due to requirements related to maintaining of all functions of the weir construction was decided to design small hydropower plant completely under the water surface, with flap mounted to the roof of the hydropower plant. Part of the thesis was also an economical assessment of designed hydropower project.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:226148
Date January 2013
CreatorsPatočka, Filip
ContributorsNeumayer,, Oldřich, Dráb, Aleš
PublisherVysoké učení technické v Brně. Fakulta stavební
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0028 seconds