The aim of the present master’s thesis is to explore the feasibility of small hydropower plant for cur-rent hydro energetic potential of the weir on Ohře river, located in the city of Terezín in Ústecký re-gion, Czech Republic. The target of the thesis itself was to design minimally two variants of constructional and technological part. Due to requirements related to maintaining of all functions of the weir construction was decided to design small hydropower plant completely under the water surface, with flap mounted to the roof of the hydropower plant. Part of the thesis was also an economical assessment of designed hydropower project.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:226148 |
Date | January 2013 |
Creators | Patočka, Filip |
Contributors | Neumayer,, Oldřich, Dráb, Aleš |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0028 seconds