Return to search

Optimised small scale reative compensation for Eskom's Albany-Wesley 66/22Kv transmission system

Reactive power compensation, as generated by capacitors, has been used to mitigate the constraints of power transmission and improve the power transfer of the transmission system of the South African power utility, Eskom‟s 66/22kV Albany-Wesley transmission system. An investigation was carried out on a number of current compensation schemes, and their operations, by means of load flow analysis. Different capacitor qualities and technologies were applied to alter the transmission line characteristics that resulted in acceptable voltage regulation. This resulted in easing the load on the lines and transformers and hence reducing line losses. For long transmission lines, utilities need voltage support, as provided for by different voltage compensators, to keep the terminal voltage within standard voltage regulation, and meet the designed power demand. The approach to large and small scale compensation was tested and the outcomes revealed distinct patterns that were used to confirm the hypothesis and improve the transfer of power. The templating temperature and thermal perspective as used by Eskom on line design was discussed and used to design a new transmission line. Load flow solutions were also used to plan and design the optimised transmission system as well as to determine the specification and location of the compensating capacitor banks. Capacitor banks, as a source of reactive power, were used to model the compensation in this research. Electrical protection and faults associated with the capacitors banks were discussed, as prevention to total blackout or load shedding on the transmission line in case of established contingency. Long term investment plans, to meet future electricity demands, require substantial investment hence a financial survey was carried out. Finally this dissertation selects a viable solution to meet the electrical power demands and then recommends a way forward for the Eskom‟s 66/22kV Albany-Wesley line.

Identiferoai:union.ndltd.org:netd.ac.za/oai:union.ndltd.org:nmmu/vital:9597
Date January 2012
CreatorsNdimurwimo, Alexis
PublisherNelson Mandela Metropolitan University, Faculty of Engineering, the Built Environment and Information Technology
Source SetsSouth African National ETD Portal
LanguageEnglish
Detected LanguageEnglish
TypeThesis, Masters, MTech
Formatxxiv 312 leaves, pdf
RightsNelson Mandela Metropolitan University

Page generated in 0.0109 seconds