This diploma thesis addresses Building Information Management (BIM) and its application in water management. The basis of the work is broad research on BIM. Subsequently, the application of BIM is demonstrated in the construction of a small hydroelectric power plant in the Litovel water management node. To conclude, the added value of using BIM and its possible disadvantages for water management are formulated.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:455373 |
Date | January 2022 |
Creators | Chládová, Zuzana |
Contributors | Remeš, Josef, Duchan, David |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0017 seconds