The aim of this thesis was to document the various stages of restoration Návežný Pond ? ?Návesný? in the cadastral Branišov. The revitalization was used Operating Environment Programme, Priority Axis 6.4. - Optimization of the landscape. The hydrological parameters were monitored pond dredging, restoration of security overflow and bypass sewer. The revitalization was to increase the retention capacity of the pond using pond sediment extraction and subsequently by increased flood protection. Another important part of the revitalization is to restore the old defunct sewer bypass construction and safety overflow for the flood. Dredging is important to perform due to animal hygiene pond environment, biodiversity ecosystem pond, retention pond production capability and protection against floods. Due to the long-term return on investment is appropriate to use financial aid as grants. For the evaluation of most subsidies have been compared three grant degrees.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:79868 |
Date | January 2011 |
Creators | ČERNÝ, Pavel |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0019 seconds