Before and after comparison of traditional five-day and four-day workweeks for TxDOT maintenance forces

The Texas Department of Transportation (TxDOT) has sought to reduce expenditures by better utilizing their maintenance forces through a compressed workweek. The focus of this thesis is a before and after comparison of maintenance crews at TxDOT during a standard 5-day forty hour workweek and a compressed 4-day forty hour workweek. Compressed workweeks are work arrangements in which full-time employees are allowed to work longer days for part of the week or pay period in exchange for shorter days or a day off during the same week or pay period. This type of schedule allows for numerous benefits including increased productivity, additional time to handle personal business, less travel time, less start up and shut down time, improved morale, as well as less stress. Originally three districts were placed upon the compressed workweek but after four months of trial, three additional districts were included. Maintenance activity data from previous years was compared to data collected over the trial period to assess productivity impacts as well as vehicular travel. Surveys of maintenance crews were conducted throughout the study to address personal concerns. The results of the study were that there were no significant impacts to productivity or vehicular usage but a significant improvement in work conditions for the maintenance crews. Further assessment is recommended utilizing additional functional codes for more illustrative results. / text

Identiferoai:union.ndltd.org:UTEXAS/oai:repositories.lib.utexas.edu:2152/19699
Date04 March 2013
CreatorsFournier, Christopher Anthony
Source SetsUniversity of Texas
Languageen_US
Detected LanguageEnglish
Formatapplication/pdf

Page generated in 0.0018 seconds