Return to search

Optimizing Construction Estimation: A Case Study of the ETSU Football Stadium and the ETSU Fine Arts Center

Considering the complexity of the construction industry, it is vital to predict costs accurately throughout the entire planning, design, and construction process of a project. Various factors such as overhead, delays, cost variation, and program and scope play significant roles in determining the viability and profitability of a project. Thus, it is important to learn about what makes construction estimates so variable even among expert estimators within the same company. This study will look at the estimation methods used by BurWil Construction Company and Denark Construction, Inc. for the ETSU Football Stadium and the ETSU Fine Arts Center, respectively, as case studies for both post- and in-development construction projects. The estimates used in different phases of the projects will be compared against the most current cost of the project; the final cost for the Football Stadium and the most up-to-date costs for the Fine Arts Center. Also, the different phases of design and construction and their corresponding estimates will be inspected thoroughly. As an ending discussion of the study, optimization efforts will be considered to assess how current planning and estimation methods can be improved to reduce cost and time for all parties involved in the project.

Identiferoai:union.ndltd.org:ETSU/oai:dc.etsu.edu:honors-1515
Date01 May 2018
CreatorsMitra, John Paul
PublisherDigital Commons @ East Tennessee State University
Source SetsEast Tennessee State University
Detected LanguageEnglish
Typetext
Formatapplication/pdf
SourceUndergraduate Honors Theses
RightsCopyright by the authors., http://creativecommons.org/licenses/by-nc-nd/3.0/

Page generated in 0.0025 seconds