Return to search

Análise do emprego de materiais alternativos no alto forno da Arcelormital Tubarão

Made available in DSpace on 2014-06-11T19:30:10Z (GMT). No. of bitstreams: 0
Previous issue date: 2010-07-02Bitstream added on 2014-06-13T20:39:47Z : No. of bitstreams: 1
mosckem_sl_me_guara.pdf: 1245042 bytes, checksum: 8a691aa6f65edd8f060ed9355bc9c3bd (MD5) / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES) / O trabalho de análise do uso de materiais alternativos no Alto Forno 1 da ArcelorMittal Tubarão estabelece uma taxa de substituição de cada material alternativo, plástico e pneu, em relação ao uso exclusivo do carvão mineral injetado no Alto Forno através das ventaneiras. A taxa de utilização de plástico e pneu é avaliada considerando o aporte de energia e dos agentes necessários para a reação química de redução do minério de ferro em ferro metálico. No presente trabalho são elaborados os balanços de massa e de energia de acordo com a configuração operacional vigente no segundo semestre de 2009 para o Alto Forno 1 e com os dados de produção do mês de julho de 2009. O resultado mostra a viabilidade técnica do uso de plástico ou pneu e estabelece as condições de uso de cada um em relação à quantidade, tipo e granulometria. A substituição energética decorrente do uso de plástico e pneu estabelece uma forma de aplicação segura e controlada deste resíduo, além de agregar valor a estes materiais normalmente descartados pela sociedade. Contribui também para amenizar os impactos ambientais decorrentes da falta de uma destinação regulamentada e eficaz para plásticos descartados e pneus inservíveis / The study of alternative fuel materials in the Blast Furnace 1 of ArcelorMittal Tubarão, establishes a rate of each material analyzed, waste plastics packaging and waste tires, in order to replace part of the pulverized coal that is usually injected in to the Blast Furnace through the tuyeres. The injection rate of waste plastic packaging and waste tires is analyzed considering the energy input and the necessary elements for the iron ore reduction chemical reaction. The mass and energy balance is done according to the operational configuration of the Blast Furnace 1 in the second semester of 2009 and operation data from July of 2009. The result of the study shows technical viability to use waste plastics packaging and waste tires and establish requirements for the injection, such as flow rate and particles size. The alternative energy provided from these waste materials builds a safety and controlled way to reach the best utilization for each one. Moreover, the environmental impact can be reduced due to its disposal is normally done in outdoor areas

Identiferoai:union.ndltd.org:IBICT/oai:repositorio.unesp.br:11449/99326
Date02 July 2010
CreatorsMosckem, Sergio Luis [UNESP]
ContributorsUniversidade Estadual Paulista (UNESP), Balestieri, José Antônio Perrella [UNESP], Junior, João Andrade de Carvalho [UNESP]
PublisherUniversidade Estadual Paulista (UNESP)
Source SetsIBICT Brazilian ETDs
LanguagePortuguese
Detected LanguagePortuguese
Typeinfo:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/masterThesis
Format95 f. : il.
SourceAleph, reponame:Repositório Institucional da UNESP, instname:Universidade Estadual Paulista, instacron:UNESP
Rightsinfo:eu-repo/semantics/openAccess
Relation-1, -1, -1

Page generated in 0.0021 seconds