Planejamento da operação energetica do sistema interligado nacional baseado em modelo de controle preditivo / Long term hydrothermal scheduling of the brazilian integrated system based on model predictive control

Orientador: Secundino Soares Filho / Tese (doutorado) - Universidade Estadual de Campinas, Faculdade de Engenharia Eletrica e de Computação / Made available in DSpace on 2018-08-15T02:32:47Z (GMT). No. of bitstreams: 1
Zambelli_MonicadeSouza_D.pdf: 4122152 bytes, checksum: 3256b0546520645ef065b43111b44374 (MD5)
Previous issue date: 2009 / Resumo: O planejamento da operação energética do Sistema Interligado Nacional (SIN) é uma tarefa complexa realizada por meio de uma cadeia de modelos de médio, curto e curtíssimo prazo acoplados entre si, cada um com considerações pertinentes à etapa que aborda. A proposta deste trabalho é apresentar uma alternativa para o planejamento da operação energética de médio prazo. Foi desenvolvida uma metodologia baseada em modelo de controle preditivo, abordando os aspectos estocásticos do problema de forma implícita pela utilização de valores esperados das vazões, e fazendo uso de um modelo determinístico de otimização a usinas individualizadas, que possibilita uma representação mais precisa do sistema hidrotérmico. A análise de desempenho é feita através de simulações da operação, considerando os parques hidrelétrico e termelétrico que compõem o SIN, com restrições operativas reais, em configuração dinâmica, com plano de expansão e a possibilidade de intercâmbio e importação de mercados vizinhos. Os resultados são comparados aos fornecidos pela metodologia em vigor no setor elétrico brasileiro, notadamente o modelo NEWAVE, que determina as decisões de geração por subsistema, e o modelo Suishi-O, que as desagrega por usinas individualizadas / Abstract: The long term hydrothermal scheduling of the Brazilian Integrated System (SIN) is a complex task solved by a chain of long, medium and short term coupled models, each one with considerations pertinent to the stage of operation that it deals with. The proposal of this work is to present an alternative for the long term hydrothermal scheduling. A methodology based on model predictive control was developed, implicitly handling stochastic aspects of the problem by the use of inflows expected values, and making use of a deterministic optimization model to obtain the optimal dispatch for individualized plants, what makes possible a more accurate representation of the hydrothermal system. The performance analysis is made through simulations of the operation, taking into consideration all the hydro and thermal plants that compose the SIN, with real operative constraints, in dynamic configuration, with its expansion plan and the possibility of interchange and importation from neighboring markets. The results are compared with those provided by the approach actually in use by the Brazilian electric sector, specifically the NEWAVE model, which defines the generation decisions for the subsystems, and the Suishi-O model, that disaggregates them for the individualized plants / Doutorado / Energia Eletrica / Doutor em Engenharia Elétrica

Identiferoai:union.ndltd.org:IBICT/oai:repositorio.unicamp.br:REPOSIP/261137
Date12 September 2009
CreatorsZambelli, Monica de Souza
ContributorsUNIVERSIDADE ESTADUAL DE CAMPINAS, Soares Filho, Secundino, 1949-, Filho, Secundino Soares, Silva, Edson Luiz da, Filho, Donato da Silva, Francato, Alberto Luiz, Peres, Pedro Luis Dias
Publisher[s.n.], Universidade Estadual de Campinas. Faculdade de Engenharia Elétrica e de Computação, Programa de Pós-Graduação em Engenharia Elétrica
Source SetsIBICT Brazilian ETDs
LanguagePortuguese
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/doctoralThesis
Format118 p. : il., application/pdf
Sourcereponame:Repositório Institucional da Unicamp, instname:Universidade Estadual de Campinas, instacron:UNICAMP
Rightsinfo:eu-repo/semantics/openAccess

Page generated in 0.0065 seconds