Return to search

Planejamento da operação energetica e da manutenção no sistema hidrotermico de potencia brasileiro / Hydrothermal power planning operation and maintenance planning in Brazilian power system

Orientadores: Sergio Valdir Bajay, Paulo Sergio Franco Barbosa / Dissertação (mestrado) - Universidade Estadual de Campinas, Faculdade de Engenharia Mecanica / Made available in DSpace on 2018-08-08T23:23:08Z (GMT). No. of bitstreams: 1
Pereira_AndreFlavioSoares_M.pdf: 1792951 bytes, checksum: a865e5b33783ba4a8f044bcff70f9809 (MD5)
Previous issue date: 2006 / Resumo: Nesta dissertação se avalia o estado da arte do planejamento da operação energética e da manutenção de usinas em sistemas hidrotérmicos de potência e se propõe algumas inovações. Neste contexto, se faz uma revisão crítica das metodologias de planejamento empregadas no setor elétrico brasileiro, incluindo as bases de dados que dão suporte a estas metodologias e dando destaque às práticas atuais do Operador Nacional do Sistema Elétrico (ONS); várias propostas de avanços metodológicos são feitas ao longo desta parte do trabalho. Uma outra parte desta dissertação envolve a aplicação de um modelo de otimização, a médio prazo, da operação de algumas usinas do Sistema Interligado Nacional (SIN), pertencentes a uma concessionária geradora no Estado de São Paulo, satisfazendo as metas de geração impostas pelo planejamento centralizado do SIN, realizado pelo ONS, e restrições associadas ao uso múltiplo da água nos reservatórios destas usinas, dentre outras. Várias funções-objetivo podem ser utilizadas neste modelo, dependendo das finalidades a serem atingidas nas simulações. O modelo foi aplicado ao parque gerador hidrelétrico da empresa AES, nos rios Tietê e Pardo; algumas simulações foram feitas, discutindo-se os resultados alcançados / Abstract: The state-of-the-art of power plant scheduling and maintenance planning in hydro-thermal power systems is evaluated in this thesis and some innovations are proposed. In this context, a critical review of the planning methodologies employed in the Brazilian power sector is carried out, including the data bases which support these methodologies and pointing out the current practices of the National Operator of the Power System (ONS); several proposals concerning advances in these methodologies are put forward along this work. In another part of this thesis, the medium-term scheduling of some power stations of the National Interlinked System (SIN) belonging to a utility in the State of São Paulo are modeled through an optimization algorithm, which meets the generation targets imposed by the centralized planning of SIN, carried out by ONS, and constraints associated to multiple uses of water in the reservoirs of these plants, among other constraints. Several objective functions can be used in this model, depending on the purposes to be achieved in the simulations. The model was applied to the hydroelectric generation system of the company AES, in the rivers Tietê and Pardo; some simulations were carried out and their results are discussed in the thesis / Mestrado / Planejamento de Sistemas Energeticos / Mestre em Planejamento de Sistemas Energéticos

Identiferoai:union.ndltd.org:IBICT/oai:repositorio.unicamp.br:REPOSIP/264637
Date15 February 2006
CreatorsPereira, Andre Flavio Soares
ContributorsUNIVERSIDADE ESTADUAL DE CAMPINAS, Barbosa, Paulo Sergio Franco, 1957-, Bajay, Sérgio Valdir, 1950-, Francato, Alberto Luiz, Filho, Secundino Soares
Publisher[s.n.], Universidade Estadual de Campinas. Faculdade de Engenharia Mecânica, Programa de Pós-Graduação em Planejamento de Sistemas Energéticos
Source SetsIBICT Brazilian ETDs
LanguagePortuguese
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/masterThesis
Format138p. : il., application/pdf
Sourcereponame:Repositório Institucional da Unicamp, instname:Universidade Estadual de Campinas, instacron:UNICAMP
Rightsinfo:eu-repo/semantics/openAccess

Page generated in 0.0026 seconds