Return to search

Times assincronos para o Job shop scheduling problem : heuristicas de melhoria

Orientadores: Pedro Sergio de Souza, Marcus Vinicius Poggi de Aragão / Dissertação (mestrado) - Universidade Estadual de Campinas, Instituto de Computação / Made available in DSpace on 2018-07-22T21:33:18Z (GMT). No. of bitstreams: 1
Haddad_ElaineGaspareto_M.pdf: 1752527 bytes, checksum: 6ecf36f9a07b62f0718f185c0fd4ca43 (MD5)
Previous issue date: 1997 / Resumo: Este trabalho aborda o problema de seqüenciamento de tarefas conhecido como Job Shop Scheduling Problem (JSP). O objetivo aqui é mostrar a adequação de uma técnica conhecida como Times Assíncronos (A-Teams), para resolver este problema de otimização combinatória, que é bastante freqüente em ambientes industriais. Esta abordagem tem sido aplicada com sucesso na resolução de outros problemas, como o Traveling Salesman Problem, o Flow-Shop Problem e até mesmo o próprio Job Shop Problem sob uma abordagem de heurísticas de construção. Esta técnica está baseada na cooperação de algoritmos heurísticos no sentido de obter soluções, possivelmente, melhores que aquelas obtidas quando os mesmos algoritmos são executados isoladamente. Neste trabalho, o enfoque é dado a heurísticas de melhoria. Outros tipos de algorit­mos foram desenvolvidos para compor os A-Teams. Estes A-Teams desenvolvidos foram acoplados a um outro já existente, baseado em heurísticas de construção. Algumas instâncias de JSP foram testadas e os resultados obtidos atestam a adequação desta técnica para a resolução deste problema. / Abstract: This work treats the sequencing of tasks problem known as Job Shop Scheduling Problem. The goal here is to show the adequability of a technique known as Assynchronous Teams (A-Teams) to solve this optimization problem which is used in industrial environments. This approach has been applied successfully in the solving of other problems such as the Traveling Salesman Problem, Flow Shop Problem and the Job Shop Problem itself using construction heuristics algorithms. This technique is based on the cooperation of some heuristics algorithms in order to obtain solutions, possibly better then ones obtained when same algorithms are working alone. In this work, the focus is on the development of improvement heuristics algorithms. Another type of algorithms were also developed to form the A-Teams. These A-Teams developed were joined to another one, based in construction heuristics. Some instances of the JSP were tested and the results obtained show the adequability oí this technique to solve this problem. / Mestrado / Mestre em Ciência da Computação

Identiferoai:union.ndltd.org:IBICT/oai:repositorio.unicamp.br:REPOSIP/276163
Date17 December 1996
CreatorsHaddad, Elaine Gaspareto
ContributorsUNIVERSIDADE ESTADUAL DE CAMPINAS, Aragão, Marcus Vinicius Soledade Poggi de, 1959-, Souza, Pedro Sergio de, 1963-, Lyra Filho, Christiano, Souza, Cid Carvalho de
Publisher[s.n.], Universidade Estadual de Campinas. Instituto de Computação, Programa de Pós-Graduação em Ciência da Computação
Source SetsIBICT Brazilian ETDs
LanguagePortuguese
Detected LanguagePortuguese
Typeinfo:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/masterThesis
Format73f. : il., application/octet-stream
Sourcereponame:Repositório Institucional da Unicamp, instname:Universidade Estadual de Campinas, instacron:UNICAMP
Rightsinfo:eu-repo/semantics/openAccess

Page generated in 0.0062 seconds