Orientador: Ademir Jose Petenate / Dissertação (mestrado) - Universidade Estadual de Campinas, Instituto de Matematica, Estatistica e Computação Cientifica / Made available in DSpace on 2018-07-21T20:33:17Z (GMT). No. of bitstreams: 1
Guerra_MarcosdeOliveira_M.pdf: 4754730 bytes, checksum: 1f32e7aa1fc8ea8ba142eb578eccd2a7 (MD5)
Previous issue date: 1996 / Resumo: Os modelos convencionais de auscultação e monitoramento de barragens são desenvolvidos a partir de informações obtidas com o acompanhamento do desempenho dos instrumentos, instalados em tais estruturas, que procuram aferir e confirmar hipóteses de segurança associadas aos critérios da fase de projeto. A partir da necessidade de desenvolver uma nova abordagem sobre o tema segurança, em particular para garantir maior confiabilidade, procurou-se, dentro do processo de interpretação e diagnóstico do comportamento das barragens, enfatizar o conceito do potencial de risco e da probabilidade de ruína, como fatores fundamentais de análise e previsão, permitindo a introdução de sistemas voltados à determinação da influência de novos componentes, tais como os decorrentes de circunstâncias dinâmicas, as variações do meio ambiente (interno e externo) as condições de estabilidade e de confiabilidade. As principais restrições, feitas aos modelos convencionais de auscultação e monitoramento de barragens, estão relacionadas à pequena capacidade de previsão do desempenho e estabelecimento de cenários futuros, à limitada abordagem da interferência com o meio, à desconsideração dos ciclos de vida útil dos empreendimentos - evolução dos materiais e equipamentos, entre outros, destacando-se, como decisivo, o fato de não levar em conta a execução de propostas efetivas e confiáveis de atuação em tempo real. Ao estabelecer avaliação comparativa, entre posturas e práticas de acompanhamento, o modelo com ênfase na caracterização da performance é sugerido como expectativa satisfatória para superar as limitações presentes, obtendo melhoria contínua e gradual, formatando e integrando os sistemas e estruturas dentro das organizações como um todo. As limitações decorrentes da unicidade dos empreendimentos, dados pontuais, bem como dos instrumentos de supervisão e controle, quando abordados por intermédio de modelos estatísticos, apresentam considerações consistentes e voltadas para a avaliação dinâmica da segurança e da confiabilidade do desempenho de barragens. Dentre as metodologias propostas para modelar os sistemas de alta performance, a escolhida para o desenvolvimento, por sua receptividade e compatibilidade com a engenharia de barragens, é aquela oferecida por Sink & Tuttle (57), na qual a caracterização do possível aumento de performance é amparado por análise dos sistemas organizacionais e gerenciais, resultando em proposta de auscultação e monitoramento do comportamento de barragens e estruturas dos sistemas hidráulico. Constata-se que as armadilhas, identificadas por Sink & Tuttle (57), existentes nos processos administrativos e técnicos, sejam eles organizacionais ou gerenciais, são similares nos sistemas de acompanhamento das barragens, bem como os sete pontos a perseguir em modelos de alta performance. As consequências dos estudos efetuados foram registradas, resultando em proposta de nova conceituação de acompanhamento das estruturas hidráulicas, verificandose sua adequabilidade aos conceitos de Qualidade com foco no aumento de performance. Para validação do modelo proposto, foi estabelecida, através de avaliação, efetuada por uma equipe experiente, a performance dos modelos convencionais e proposto, nos quais procurou-se "mensurar" os resultados obtidos na auscultação e monitoramento de barragens. / Abstract: The usual models for dam monitoring were developed from informations taken from the observations made on the behaviour of the instruments ínstalled at those structures. The aim of those procedures are to check and confirm some hipothesis on dam safety, made according to the design criteria. The so called deterministic models may be considered as low performance for dam safety, because they only take in account civil engineering concepts, related to rheological properties and construction techniques. From the detected need to develop a new and more reliable approach on dam safety, a new proposal was made, by working on the processes of interpretation and diagnosis of dam behavior, and emphasizing the 'potential of risk' and 'failure probability' as essentials to the behaviour analisis and prediction. This allows the introduction of new tools, to determine the ascendancy of new factors, as those time-dependant ones, like environmental conditions- internal and external- , on the dam stability and reliability. The main restrictions made to the conventional models for dam monitoring are related to the limited capacity to performance prediction, the sceneries' setup of for the future. Those models doesn't take in to account the environmental interferences, the lifetime of the projects, and the evolution on construction and material technology. And, must be emphasized as decisive, those models cannot provide immediate and reliable information ín case of need. By an comparative evaluation between the monitoring pratice and postures, the model emphasizing the performance modelling ís suggested, as enough good to surpass the present limitations, getting an continuous and gradual improvement, formatting and completting the systems and structures of the whole organization. Some limitations, as the single characteristics of each structure, the punctual sampling taken from the instruments, and the limitations of the instruments themselves usually are rounded by statistical modelling, allowing the achievement of consistent information to an dinamic evaluation of the reliability and safety of dams. In the universe of proposed methods to the modelling of high performance systems, that one offerred by Sink & Tuttle was choosen, by this compatibility with dam engineeering. The performance growth is supported by an analisis of the management and organizational systems, resulting on the proposal to dam monitoring. It was verified that the Sink & Tuttle's traps, identified at the administrative and technical processes, are in their headlines so presents at the dam monitoring processes, as well the seven points to be chasen in high performance models. The effects of the studies were registered, resulting in a new concept for dam & structures monitoring, checking its suitability to the Quality concepts, focused on the performance improvement. The proposed model was made valid from an evaluation of the usual models, made by a well experienced team, in which a trial to measure the dam monitoring results was made. / Mestrado / Mestre em Qualidade
Identifer | oai:union.ndltd.org:IBICT/oai:repositorio.unicamp.br:REPOSIP/306685 |
Date | 19 December 1996 |
Creators | Guerra, Marcos de Oliveira |
Contributors | UNIVERSIDADE ESTADUAL DE CAMPINAS, Petenate, Ademir José, 1950-, Barbosa, Paulo Sergio Franco, Guerra, Ana Cervigni |
Publisher | [s.n.], Universidade Estadual de Campinas. Instituto de Matemática, Estatística e Computação Científica, Programa de Pós-Graduação em Qualidade |
Source Sets | IBICT Brazilian ETDs |
Language | Portuguese |
Detected Language | Portuguese |
Type | info:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/masterThesis |
Format | 161f. : il., application/pdf |
Source | reponame:Repositório Institucional da Unicamp, instname:Universidade Estadual de Campinas, instacron:UNICAMP |
Rights | info:eu-repo/semantics/openAccess |
Page generated in 0.003 seconds