Thesis (S.M.)--Massachusetts Institute of Technology, System Design and Management Program, 2005. / Includes bibliographical references (p. 117-122). / The paper studies a real word project of an enterprise software product re-architecting at a mid-sized telecommunication company. It begins with a description of the company and the software product, as well as an elaboration of the project under study. Using written surveys and follow-up interviews as the primary data gathering tools, the paper collects and tabulates first-hand experience and opinions from key project participants. Based on the survey results, the paper proposes an integrative implementation framework, based primarily on literature reviews in offshore outsourcing, systems and project management (SPM) and product design and development (PDD), for a detailed analysis of key challenges encountered by the project under study. The paper also investigates if specific key challenges could have been managed or influenced by the application of specific methods and tools within the proposed framework. / by Kok-Seng (Darrel) Quah. / S.M.
Identifer | oai:union.ndltd.org:MIT/oai:dspace.mit.edu:1721.1/32470 |
Date | January 2005 |
Creators | Quah, Kok-Seng |
Contributors | Daniel Whitney., System Design and Management Program., System Design and Management Program. |
Publisher | Massachusetts Institute of Technology |
Source Sets | M.I.T. Theses and Dissertation |
Language | English |
Detected Language | English |
Type | Thesis |
Format | 122 p., 7072247 bytes, 7079293 bytes, application/pdf, application/pdf, application/pdf |
Rights | M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission., http://dspace.mit.edu/handle/1721.1/7582 |
Page generated in 0.0022 seconds