Updating MIT's cost estimation model for shipbuilding

Thesis (S.M. in Naval Architecture and Marine Engineering)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2008. / "LTJG Matthew B. Smith, USCG." / Includes bibliographical references (leaf 82). / This thesis project will update the MIT ship cost estimation model by combining the two existing models (the Basic Military Training School (BMTS) Cost Model and the MIT Math Model) in order to develop a program that can accurately determine both a ship's acquisition cost as well as its life cycle cost. Using United States Coast Guard resources, this project will also address various aspects of the ship design process which have a direct effect on the cost of building a ship. This will include, but not be limited to, the cost estimation process, determining which design decisions have the biggest impact on the ship's total cost, common pitfalls in the design process that lead to increases in cost, and lessons learned that have helped minimize the cost of a ship. / by Matthew B. Smith. / S.M.in Naval Architecture and Marine Engineering

Identiferoai:union.ndltd.org:MIT/oai:dspace.mit.edu:1721.1/44876
Date January 2008
CreatorsSmith, Matthew B., Lieutenant, junior grade
ContributorsJoel Harbour., Massachusetts Institute of Technology. Dept. of Mechanical Engineering., Massachusetts Institute of Technology. Dept. of Mechanical Engineering.
PublisherMassachusetts Institute of Technology
Source SetsM.I.T. Theses and Dissertation
LanguageEnglish
Detected LanguageEnglish
TypeThesis
Format82 leaves, application/pdf
RightsM.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission., http://dspace.mit.edu/handle/1721.1/7582

Page generated in 0.0121 seconds