Return to search

Batch scheduling of two-machine limited-buffer flowshop with setup and removal times

Thesis (Ph. D.)--School of Industrial and Systems Engineering, Georgia Institute of Technology, 2004. Directed by Chen Zhou. / Vita. Includes bibliographical references (leaves 87-90).

Identiferoai:union.ndltd.org:OCLC/oai:xtcat.oclc.org:OCLCNo/54905430
Date January 2003
CreatorsDai, Jianbin,
Source SetsOCLC
LanguageEnglish
Detected LanguageEnglish
SourceAvailable online, Georgia Institute of Technology, 2004:

Page generated in 0.0096 seconds