Optimización del planeamiento y control de un proyecto inmobiliario, a través de LPS y un modelo BIM para el secuenciamiento e identificación de restricciones / Optimization of the planning and control of a real estate project, through LPS and a BIM model for the sequencing and identification of restrictions

Mediante el presente trabajo se demuestra la viabilidad de poder integrar la metodología Lean Construction, a través de su principal herramienta (el Last Planner), con el BIM (Building Information Modeling) generando una mejora de productividad enfocada a las etapas de diseño y construcción de un proyecto inmobiliario. La integración se resume en el soporte tecnológico de los modelos virtuales desarrollados por el BIM en conjunto con la manera como se trabaja la información brindando un soporte efectivo y que suma valor a los procesos ejecutados por el Last Planner. A través de un análisis de interferencias e incompatibilidades que pueden ser consideradas como restricciones de obra, al ejecutarse la planificación del avance, se pudo determinar una liberación de restricciones no identificadas que podrían ser considerables a la hora de ejecutar el proyecto y que no se hubieran detectado de manera temprana trayendo consigo retrasos. Además, se tiene un soporte visual de lo ejecutado y de lo planificado, en conjunto con la posibilidad de dar soluciones a problemas de constructabilidad del proyecto. Se considera un ahorro en trabajos rehechos a través de la integración de ambos elementos y se traduce en una mejora de PPC y de SPI, demostrando que tanto en planeamiento como en el control del proyecto se puede optimizar la productividad con el análisis descrito. / Through this work we demonstrate the feasibility of being able to integrate the Lean Construction methodology, through its main tool (the Last Planner), with the BIM (Building Information Modeling), generating an improvement in productivity focused on the design and construction stages of a real estate project. The integration is summarized in the technological support of the virtual models developed by the BIM together with the way in which the information is worked providing an effective support that adds value to the processes executed by the Last Planner. Through an analysis of interferences and incompatibilities that can be considered as work restrictions, when executing the progress planning, it was possible to determine a release of unidentified restrictions that could be considerable at the time of executing the project and that would not have been detected early, bringing with it delays. In addition, there is a visual support of the executed and the planned, together with the possibility of giving solutions to problems of constructability of the project. It is considered a saving in reworked works through the integration of both elements and results in an improvement of PPC and SPI, demonstrating that both in planning and in the control of the project, productivity can be optimized with the analysis described. / Tesis

Identiferoai:union.ndltd.org:PERUUPC/oai:repositorioacademico.upc.edu.pe:10757/625159
Date15 November 2018
CreatorsChávez Ñaupari, Fernando Pros`t Deninson, Toledo Pineda, Julio Alfredo
ContributorsGutiérrez Lazarte, Frederick Michell
PublisherUniversidad Peruana de Ciencias Aplicadas (UPC)
Source SetsUniversidad Peruana de Ciencias Aplicadas (UPC)
LanguageSpanish
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/bachelorThesis
Formatapplication/pdf, application/epub, application/msword
SourceUniversidad Peruana de Ciencias Aplicadas (UPC), Repositorio Académico - UPC
Rightsinfo:eu-repo/semantics/openAccess, Attribution-NonCommercial-ShareAlike 3.0 United States, http://creativecommons.org/licenses/by-nc-sa/3.0/us/

Page generated in 0.0027 seconds