碩士 / 國立高雄第一科技大學 / 營建工程系 / 89 / Abstract
Key Words:Sewerage System、Design/Build、Contractor Selection Process
The percentage of population served by sewerage system is recognized as one of the indices to measure the level of the modernization and the competitive advantage of a country. The household pipe-connection defined as the work connecting the facilities of user to the public sewerage system is always the last stage and crucial for the function of entire sewerage system. For the purpose of shortening execution duration and encouraging the introduction of innovative construction methods and materials, the design/build delivery method is increasingly adopted to replace the traditional design-bid-build method in some of the public sectors.
The success of Design/Build delivery method is highly dependent on the design-builder’s ability of managing resources such as capital, equipment, manpower, materials, and time to achieve the overall project objectives. Therefore, an appropriate contractor selection process is definitely a critical factor to ensure the successful delivery of the project. This research was designed to collect information from(1)a comprehensive literature review of domestic and foreign regulations and previous research reports of various types of project delivery methods,(2)a two way communication conference for clarifying current government policies and identifying the different attitudes of the attendants such as consultants and contractors, and(3)a questionnaire survey of the firms involved in the household pipe-connection program.
Conclusions were made based on the analysis of the information collected. Complying with the Government Procurement Law, neither two nor three stages contractor selection process, which has been widely employed in many developed countries allowed. The best-value-buy contractor selection process of which the one stage qualification-based selection process replaces the traditional low-bid-win philosophy of design/bid/build delivery method, is recommended for the household pipe-connection program with the following terms (1) basic contractor qualification requirements, (2) the requirement of 25%~35% completion of design submittal, (3) either designer or contractor can be the D/B prime contractor, and (4) a unit price contract with a ceiling contract amount.
Identifer | oai:union.ndltd.org:TW/089NKIT0512002 |
Date | January 2001 |
Creators | Wu, Hsien Sang., 吳銜桑 |
Contributors | Lo, Wei., 羅維 |
Source Sets | National Digital Library of Theses and Dissertations in Taiwan |
Language | zh-TW |
Detected Language | English |
Type | 學位論文 ; thesis |
Format | 224 |
Page generated in 0.0132 seconds