Productivity model analysis on the main work of sewerage system branch networks—Take Kaohsiung as example / 污水下水道分支管網工程主要作業之生產力模型分析-以高雄市為例

碩士 / 國立高雄應用科技大學 / 土木工程與防災科技研究所 / 94 / The present domestic sewerage constructors and other construction schedules are mostly evaluated by experience, and take the construction process as the representation of executive results. For the use of human resource, however, and the relationship between unit values are still maintaining on the experience-based stage for the schedule of human resource. It will be helpful to understand how the constructors operate their human resource if the involvement of human resource is reexamined, quantifying the quantitative testing through scientific ways. The preliminary productivity theory, applied in manufacture and used as a tool to measure the efficient use of the resource (manufacturing factors), whose core is to discuss the evaluated technology of investment resource and productivity efficiency. The research, based on the relevant productivity theories of Thomas, focuses on the branch networks of sewerage system, and proceeding as case study. Referring to the construction process, which is analyzed by crew-working, drilling and oscillator crews are the major cores that the branch networks of sewerage system based on.
The research is based on the record of the factors of productivity influence, and developing the productivity evaluation model through statistic regression. The analysis shows that the best daily productivity values of drilling crew’s tunneling work and that of oscillator crew’s 300wh/m short pipe oscillator work, are 3.541wh/m and 2.459wh/m respectively. The main factors which affect productivity of drilling crew such as machine breakdown, maintenance and recovery of pipelines, exclusion of road obstacles; those of oscillator crew are factors for delayed pipeline move, and solution for tunneling accidents. The preliminary conclusion acquired in this research can be provided as a reference for the constructors in formulating future schedules of human resource, and preventing the construction from being intervened by influential factors, efficiently controlling the construction process.

Identiferoai:union.ndltd.org:TW/094KUAS0653061
Date January 2006
CreatorsI-Ding Lin, 林怡廷
ContributorsTzong-Tzeng Lin, 林宗曾
Source SetsNational Digital Library of Theses and Dissertations in Taiwan
Languagezh-TW
Detected LanguageEnglish
Type學位論文 ; thesis
Format120

Page generated in 0.0075 seconds