碩士 / 國立高雄第一科技大學 / 營建工程所 / 94 / Abstract
The sewer system is an important infrastructure for a modern country, and is
evaluated as a critical index of world competitiveness in the world. Based on the
preliminary estimates of this research, it is forecasted that the cost of Sewer House
Connection Construction (SHCC) will approach one billion NT to achieve the goal of
80% waste water treated. Based on the initial study conducted by this research, few
scheduling and planning works were performed for the SHCC. By observations,
interviews, and reviewing historical data, this study analyzed the sequencing logic of
the SHCC; then, together with the productivity data provided by an early study, a
preliminary schedule for a finished project was manually developed. Duration of the
studied case was originally scheduled by the contractor as 180 work days; however,
according to the method developed by this research, the work can be done in 130 days,
which is 27% shorter than the original schedule. But more work is still needed to
improve the effectiveness and efficiency of the scheduling methodology developed in
this study.
Identifer | oai:union.ndltd.org:TW/094NKIT5512014 |
Date | January 2006 |
Creators | Hung-Lun Lin, 林鴻倫 |
Contributors | Chien-Liang Lin, 林建良 |
Source Sets | National Digital Library of Theses and Dissertations in Taiwan |
Language | zh-TW |
Detected Language | English |
Type | 學位論文 ; thesis |
Format | 147 |
Page generated in 0.0082 seconds