Study on The User’s Drainage Facility of Sewage System / 污水下水道用戶排水設備配套措施之研究

碩士 / 國立臺北科技大學 / 土木與防災研究所 / 95 / Due to the engineering construction and operating management problems in user’s drainage facility of sewage system, county governments shall be in charge of the construction of user’s drainage facility by themselves at present. Therefore, this study is focused on the encountered problems and related measures of user’s drainage facility in construction and operating management aspects from a standpoint of each county government.

The problems from the user’s drainage facility installation could be generalized in ten different types which are model of the user’s drainage facility installation, householders with no interests in pipe connection, septic tank, exceeding inflow, demarcation point between public and private works, building control, construction obstacle, information management, user fee and operating management fee. Hence, the recommendable solutions to the problems will be proposed in this study so that the conclusion shown below could be obtained.

1.The first step is to decide model of the user’s drainage facility installation, and the operating management after hardware finished should be the most essential factor.
2.It would abandon the user’s drainage facility installation rather than connect pipes from piercing hole in the wall or choosing small region interception system.
3.No matter the user’s drainage facility installation will be held or not, the intercept station with functions of screening and grit removal should be set up.
4.The user’s drainage facility installation ought to use pipes in orange color to prevent misconnection and mixed connection errors from the rainwater as well as sewage and avoid exceeding inflow.
5.Authority should intervene properly in the user’s drainage facility installation and shows the discrimination between cooperative and uncooperative persons in order to encourage people to apply the household sewage pipe connection work.
6.A suitable standard operating procedure of construction and operating management of sewage system should be established at an early date to meet the needs of administrative management.
7.It shall establish a sewer management information system to promote the quality of the user’s drainage facility installation in operation and management aspects.
8.A completed sewer management information system consists of hardware facilities, software, sewage system information, and topographic chart with a scale of 1/1000.
9.The user fee must be imposed at an early date, or it will seriously affect the finance of county government.

Identiferoai:union.ndltd.org:TW/095TIT05653003
Date January 2006
CreatorsJian-Fei Yang, 楊健飛
ContributorsJames C. Ni, 倪至寬
Source SetsNational Digital Library of Theses and Dissertations in Taiwan
Languagezh-TW
Detected LanguageEnglish
Type學位論文 ; thesis
Format125

Page generated in 0.014 seconds