碩士 / 義守大學 / 管理研究所碩士班 / 96 / The Arm Forces of the Republic of China carries out to organize the change after 1997, appear the research of many studies about organization change and work results connection. This research with a certain logistics maintain the unit for research object, adopt the analytical mode of reasonableness policy, supposing the “Organization change”, “Process reengineering” and “Performance” is a structure, design the research structure, identify the individual cases data with the reference, using the depth interview as substantial evidence. Inquire into and the cause and effect relation of the analysis variable.
Complete the analysis and depth interview and compile, the research object experiences the retrenchment of the significant degree, during organizing change policy performance process, occurrence such as “Quit to incline to heat up”, “Lost the technique”, operate for the organization produce disadvantageous phenomenon and the problem, but very the majority thinks, make use of the process reengineering, would promote the whole work for the unit, but the appropriate programming integration is a supplementary opinion, just unlikely the process of the retrenchment is too rush, the operate for the organization produce the disadvantageous of research.
Through this research detection, although the organization change will produce “Quit to incline to heat up” and “man-hour reduces…Etc.” the condition of the disadvantageous organization operation, but, can be promoted the effect by the change current condition, found the innovation or improvement the method that resource usage, can improve the work performance, through depth interview found, practicing the e engineering, the profession integrates, the energy development, can promote the work performance. Therefore, we can prove that, between organizations changed, process reengineering and performance, cause and effect relation is established.
No matter what kind of research, should have the shortage necessarily, at this, put forward the following suggestion, the part of the “Organization change”, should appropriate setting personnel to avoid the operation difficult and techniques run off; the part of “Process reengineering ”, should prepare budget to improve the e engineering environment, purchase the full-automatic equipment, reduce personnel’s expense; the part of “Performance”, the dissimilarity work should have the different calculation method, just would not cause the data mistake.
Identifer | oai:union.ndltd.org:TW/096ISU05121062 |
Date | January 2008 |
Creators | Yao-chung Kuo, 郭耀中 |
Contributors | none, none, 藍於琛, 葉上葆 |
Source Sets | National Digital Library of Theses and Dissertations in Taiwan |
Language | zh-TW |
Detected Language | English |
Type | 學位論文 ; thesis |
Format | 162 |
Page generated in 0.0015 seconds