碩士 / 國立高雄第一科技大學 / 營建工程所 / 96 / The sewer system is an important infrastructure for a modern country, and evaluated as a critical index of world competitiveness in the international society.By observations and interviews, few scheduling and planning works were performed for the Sewer Household Connection Construction (SHCC), and are not able to distribute resource well, and therefore raise the risk of delay.Few research were performed on the scheduling for the SHCC; it is necessary to develop a scheduling model to help the SHCC scheduling work.This research improve the scheduling model developed by the research namely "A Research on Applying Genetic Algorithm to Schedule of Sewer Household Connection Construction."According to the method developed by this research, the SHCC work can be done in 115 days compared to the 146 days schedule developed by the previous research.
Identifer | oai:union.ndltd.org:TW/096NKIT5512016 |
Date | January 2008 |
Creators | Chih-wei Lu, 呂至偉 |
Contributors | Chien-Liang Lin, 林建良 |
Source Sets | National Digital Library of Theses and Dissertations in Taiwan |
Language | zh-TW |
Detected Language | English |
Type | 學位論文 ; thesis |
Format | 104 |
Page generated in 0.0118 seconds