The Study and Implementation of Working-Hour and cost Estimation System for Power Supply Pilot Run / 電源供應器試作工時及成本預估系統之模式研究與建置

碩士 / 聖約翰科技大學 / 自動化及機電整合研究所 / 96 / ABSTRACT

For a product at mass production stage, the standard working-hour is set up in advance. However, the actual working-hour may not be equal to the standard working-hour. In addition, so far in the product sample development stage, PVT (Prototype Verification Test), EVT(Engineerings Verification Test) and DVT (Design Verification Test ) are not considered for defining working hours. This research applied the methodology of Case-Based Reasoning (CBR) with practical cases in the past to estimate working-hour and cost of the products. The estimation system of working-hour and cost was constructed based on power supply products. The system can be applied to various product models flexibly to obtain their working-hours and cost in total. When gathering required information for the system, our considerations including production line setup, part assembly process, but excluding uncertain factors suchas different skill levels of workers, special assembly process for parts, reworking for the reason of engineering changes, etc. Based on the considerations, we derive several mathematical equations to model the estimation system of working-hour and cost. Finally, we implemented the model by applying Excel and Access tools. The system can be used as references for product development, production line scheduling, budget preparation, etc. Furthermore, the results from the estimation system were compared with the actual process to analyze exceptional situations and their working-hours.


Keyword: Working-Hour estimation, Product Cost estimation,
Power Supply, Case-Based Reasoning (CBR).

Identiferoai:union.ndltd.org:TW/096SJSM1689012
Date January 2008
CreatorsHsu Chi Yuan, 徐琦媛
Contributors劉天倫
Source SetsNational Digital Library of Theses and Dissertations in Taiwan
Languagezh-TW
Detected LanguageEnglish
Type學位論文 ; thesis
Format0

Page generated in 0.0238 seconds