The Solution for Problem Encountered during Construction of Sewage Drainage System in Taipei County / 污水下水道管渠系統工程興建遭遇問題及解決方案之研究-以台北縣為例

碩士 / 國立臺北科技大學 / 土木與防災研究所 / 96 / The construction of underground sewage is reckoned to be of one of the major important public facilities of modernized country to improve environmental pollution, increase utility of water resources, and render complete of urban development. Among these works, drainage system is the key to achieve the secularized rate of pipeline-connection. As found from the case study collected, if the features of construction site is not fully appreciated during planning and designing, such as geology, underground pipeline, and environmental conditions, when work is implemented it is likely that works cannot be carried out smoothly and successfully. Even more, it is likely that construction method has to be changed, leading to the occurrence of〝hindrance to works implementation〞as procrastination of works deadline and increase of expenditures. Therefore, the primary objective of this study is to make use of analysis and discuss of the case study so as to find out the factors of impact, and so as to put forth resolutions for reference of subsequent similar works.
This study has resorted to Taipei County as its scope of research, and made used of the 4 actual cases already contracted out as subjects of analysis, and various scenarios of〝hindrance to works implementation〞 are chosen based on factors as 「construction period」、「expenditure」、「location of construction site」、「stipulation of contract」 and 「underground hindrance」. Then, problem analysis is conducted in accordance to the context each of the case, and they can be found into items as 「impact encountered」、「factor encounter」、「currently coping measure」 and 「existing problem to the coping measure」. From the item analysis of items investigated, the study has discovered the measures of resolution can be classified into three categories which are respectively as 「modification approach of works contract」、「modification approach of technical service contract」 and 「administrative affairs of the public department」. Besides, this study should, based on the relevancy of the resolutions regarding the〝hindrance to works implementation〞in the previous 4 cases, render feedback to the resolutions of works hindrance as found in the collected cases. The results of this study should benefit the planning and design of subsequent works or work as reference for works hindrance encountered, and help to enhance the works quality as well as the secularized rate of pipeline-connection.

Identiferoai:union.ndltd.org:TW/096TIT05653054
Date January 2008
CreatorsChing-Wei Li, 李淨維
Contributors倪至寬
Source SetsNational Digital Library of Theses and Dissertations in Taiwan
Languagezh-TW
Detected LanguageEnglish
Type學位論文 ; thesis
Format138

Page generated in 0.0182 seconds