碩士 / 逢甲大學 / 工業工程與系統管理學研究所 / 99 / The steelmaking factory need coal ore, iron ore and flex ore to refining metallurgy, all the material are transported by shipping. It’s indispensable to having a exclusive dock to discharging the material. The material cost contains procurement cost and shipping cost, most of materials are detriment from oversea by bulk carrier.
Thus , Six Sigma(D-M-A-I-C)will be the main structure of this research, try to find out the key factor that affects the manufacturing process. Finally increase discharging efficiency.
Identifer | oai:union.ndltd.org:TW/099FCU05031004 |
Date | January 2011 |
Creators | Chi-chuan Tsai, 蔡奇全 |
Contributors | none, 葉忠 |
Source Sets | National Digital Library of Theses and Dissertations in Taiwan |
Language | zh-TW |
Detected Language | English |
Type | 學位論文 ; thesis |
Format | 33 |
Page generated in 0.0196 seconds