碩士 / 國立屏東科技大學 / 土木工程系所 / 100 / The Contents of Abstract in this Thesis:
The thesis collects the sewage pipe jacking methods currently applied in Taiwan to point out the difference in the mechanism between the shield tunneling method and the pipe jacking method. The differences in pipe materials, equipments and construction methods between these two methods are also explained. The thesis lists the items which must be noted during pre- and under pipe jacking construction, including the required items for construction quality control, trouble shooting for the breakdown of the pipe jacking machine, the way to select pipe size and pipe material, the ground improvement methods for poor ground condition, and the auxiliary methods and security monitoring system to prevent affecting the near-by structures.
In addition, for the maintenance issues of pipe jacking machine, the thesis suggests to establish maintenance and repairing card system, and go along with the inspecting and rewards and penalty system implemented by the government. As regards the education and training of the pipe jacking, the thesis suggests to offer training courses for the sewage pipe jacking operating technician and manager, and to set up the certification examination system of sewage by the government.
Identifer | oai:union.ndltd.org:TW/100NPUS5015041 |
Date | January 2012 |
Creators | Ping-Tse Lin, 林秉澤 |
Contributors | Dr. Chi-Hsing Wu, 吳志興 博士 |
Source Sets | National Digital Library of Theses and Dissertations in Taiwan |
Language | zh-TW |
Detected Language | English |
Type | 學位論文 ; thesis |
Format | 74 |
Page generated in 0.0089 seconds