碩士 / 中華大學 / 企業管理學系碩士班 / 101 / The LED chip manufacturing (LED-CM) is an important process in the LED supply chain. The make-to-order production strategy is a general production model for the LED-CM plants to satisfy the variety requirement of their customers. However, the special features of the unstable production output and a product composed of the chips of different feasible Bins exist in the LED-CM plant. The production planner will confront the issue of effective inventory control and exact due-date performance under the severely competitive pressure. Therefore an effective order fulfillment procedure for production planners is a required key issue to accomplish the inventory control and exact due-date performance.
LED-CM plant order fulfillment process includes shipping of product. While a product composed of the chips of different feasible Bins, there are lots of combinations of Bin shipping. In order to increase the times of different Bins shipping in the future, evaluating the optimization of combinations of Bin shipping is very important. Therefore, the purpose of this research is to increase Bin shipping and satisfying the variety requirements of customers. Thus an order fulfillment model and Bin shipping model for production planner is proposed to meet the requirements of the LED-CM plants, and at last a simulation experiment is also utilized to demonstrate and evaluate the applications and effectiveness of the proposed model.
Identifer | oai:union.ndltd.org:TW/101CHPI5321027 |
Date | January 2013 |
Creators | Tzu-Fang Hsu, 徐梓芳 |
Contributors | Horng-Huei Wu, 吳鴻輝 |
Source Sets | National Digital Library of Theses and Dissertations in Taiwan |
Language | zh-TW |
Detected Language | English |
Type | 學位論文 ; thesis |
Format | 83 |
Page generated in 0.0111 seconds