人工溼地水文系統研究-以新海三期為例

碩士 / 逢甲大學 / 水利工程與資源保育學系 / 101 / Economical development with natural resources and biological conservation is a tough challenge in the future. Creation of constructed wetlands is one popular method to build a biological diversity, water purification, recreation environment. New Taipei city government hence built a group of constructed wetlands along Dahan River. However, hydrological and hydraulic situations are the two important factors to affect the constructed wetlands’ efficiency.
Shinhai Stage III constructed wetland is the study area in this research. Daily rainfall record of 2010 is the base, and MIKE SHE model applied as the tool to simulate the water budget system. The aim of this study is to understand the water demand Shinhai Stage III constructed wetland.

Identiferoai:union.ndltd.org:TW/101FCU05398005
Date06 February 2013
Creators江彥賢
Contributors蘇惠珍
Source SetsNational Digital Library of Theses and Dissertations in Taiwan
Languagezh-TW
Detected LanguageEnglish
Type學位論文 ; thesis
Format67

Page generated in 0.0109 seconds