Study of Performance Management of CAT 3412 Marine Engine Overhaul-Case of C Company of Tainan Facility / CAT 3412遊艇引擎大修之績效管理研究-以C企業台南廠區為例

碩士 / 崑山科技大學 / 企業管理研究所 / 101 / Study of Performance Management of CAT 3412 Marine Engine Overhaul-Case of C Company of Tainan Facility

Student* Liang-Yu Chueh
Advisor** Chin-Chiuan Lin
Advisor**Chiang-Jiang Lee

*Graduate School of Business Administration, Kun Shan University
**Department of Business Administration, Kun Shan University

ABSTRACT
In 2012 the export value of Taiwan's yacht industry, the average unit price of an export yacht up to 30.38 million than last year, the average price per vessel increased by 5.7 million, the average unit price growth of 24%, a new record high, Taiwan yacht industry continue to enhance the added value of products, continue to expand our production capacity and strengthen competitiveness towards high value-added luxury. The giant yachts development Ship yacht industry, become one of the important industries in Taiwan and the world competition. The study applied six (6 Sigma) standard deviation of the DMAIC methodology spindle, starting from the definition, the use of the threat opportunity matrix SIPOC method defined engine overhaul processes and architecture. Then, the operation of the existing plant data become the measurement phase VOC/VOB to confirm output indicators and process elements to CCR/CTR. Then use the fishbone diagram, cause and effect matrix diagram, failure mode analysis and MGPP law analysis to enhance the efficiency of the engine overhaul impact factors and the degree of discussion in the analysis phase. Convened after the analysis is completed internal meeting of experts to discuss the need for re-design is necessary to these results, no problem entering the verification stage. Feasible improvement matters and process control systems based on the impact to be established, the final implementation of the verification. Finally, the study obtained performance improvement results. The research setting increase profit 4%, the actual performance improvement, indeed achieve the desired goal, and the first phase of the overall research process also be obtained via statistical service personnel employees enhance the improvement of the efficiency of 14%, overall maintenance staff efficiency, can obviously recognized engine overhaul business profitability has been rising significantly confirm a positive correlation between the two, in line with the study originally expect.
Keywords: Overhaul, Power systems, Six sigma, Fish bone diagram

Identiferoai:union.ndltd.org:TW/101KSUT0121003
Date January 2013
CreatorsLiang-Yu Chueh, 闕良宇
ContributorsChin-Chiuan Lin, Chiang-Jiang Lee, 林清泉, 李滄江
Source SetsNational Digital Library of Theses and Dissertations in Taiwan
Languagezh-TW
Detected LanguageEnglish
Type學位論文 ; thesis
Format60

Page generated in 0.0117 seconds