The Research of Indefinite Delivery Contracts Implementation and Case Studies for Household Sewerage Pipes Connections of Taipei City / 臺北市污水下水道用戶接管 開口契約內容及執行案例之研究

碩士 / 國立中央大學 / 營建管理研究所在職專班 / 102 / ABSTRACT
The past research of indefinite delivery contracts have discovered that different project sizes and
characteristics affect the application of indefinite delivery contracts to the projects. They also
suggested thatgovernment organizations can establish different indefinite delivery contract
structures for the projects of different characteristics. However, past researches seldom discuss and
analyze such topic on indefinite delivery contracts for sewerage construction. Therefore, this
research focuses on the system, administration and implementation of indefinite delivery contracts
for sewerage construction from the supervision perspective. This research starts with literature
reviews of the current practices of sewer systems (including sewerage fee structure) in Taiwan,
United States, Japan and Singapore as well as reviews of indefinite delivery contracts.The
differences between indefinite delivery contracts and traditional contracts are then analyzed and
discussed to understand the major characteristics of indefinite delivery contracts for sewerage. In
addition, this research collects five real cases, which consist of seven different obstacles commonly
encountered in the sewerage construction. These obstacles are compensation for private land,
central skylight of buildings, dangerous buildings, underground pipeline barriers, submerged
existing manholes, huge ground elevation difference, and old buildings. This research introduces
these obstacles, and discusses and proposes meansand solutions to deal with these obstacles. All the
discussions and analyses are validated through interviews with domain experts and questionnaire
surveys. This research aims to organize the practical experiences in the domain and to provide a
guide for future household sewerage pipes connections using indefinite delivery contracts in order
to reduce possible disputes and guarantee smoother project implementation.

Identiferoai:union.ndltd.org:TW/102NCU05718012
Date January 2014
Creatorslee wei hung, 李威宏
Contributors王翰翔
Source SetsNational Digital Library of Theses and Dissertations in Taiwan
Languagezh-TW
Detected LanguageEnglish
Type學位論文 ; thesis
Format103

Page generated in 0.0018 seconds