Irrigation Channel Engineering Decisions and Problem Solutions - Yunlin Low-Lying Areas as an Example / 農田灌溉渠道工程決策實務與問題解決方案-以雲林低海拔地區為例

碩士 / 國立雲林科技大學 / 營建工程系 / 104 / The researchers carried out through the competent channels for irrigation engineering team or a senior member of qualitative interviews and questionnaires for the participation of all the engineering staff, as well as team members make acceptance score performance engineering for cases where you find more properly fit the farmland priority irrigation canal engineering decisions, and solutions to problems.
The results of this study found that comprehensive comparison of quantitative research and qualitative research, quantitative research of the highest scoring of the three cases, the priority sequence of its decision-making criteria and qualitative results similar high; the lowest score of the two cases, and its decision-making criteria qualitative research results are very different, showing qualitative research and quantitative research results have correspondence, should be used as guidelines for future irrigation channel construction decisions based on the reference. The decision criteria in order of priority, the study recommended that in order to "Elevation" treated as the highest priority, followed by a serious lack of work to solve the problem, once again deal with a natural disaster, followed by sequential order of priority is the traffic problem, rush plan, resolve minor labor shortage, land use coordination, facilities migration, across town, human factors.

Identiferoai:union.ndltd.org:TW/104YUNT0582007
Date January 2016
CreatorsKun Chu Lai, 賴昆助
ContributorsShu Shun Liu, 劉述舜
Source SetsNational Digital Library of Theses and Dissertations in Taiwan
Languagezh-TW
Detected LanguageEnglish
Type學位論文 ; thesis
Format83

Page generated in 0.0057 seconds