碩士 / 國立屏東科技大學 / 工業管理系所 / 106 / This study mainly focuses on the allocation of manpower resources station phase repair and maintenance factory in aircraft navigation system. The optimal allocation model of manpower sources is constructed by using a linear programming. This propose model using the linear programming software program LINGO version 15.0 to run the linear programming model for manpower allocation problem. The model will also provide a maintenance factory performance and cost analysis function to promote the operational efficiency of aircraft navigation industry.
Identifer | oai:union.ndltd.org:TW/106NPUS5041004 |
Date | January 2018 |
Creators | Tsai, Yu-Ta, 蔡侑達 |
Contributors | Su, Ty-Son, 蘇泰盛 |
Source Sets | National Digital Library of Theses and Dissertations in Taiwan |
Language | zh-TW |
Detected Language | English |
Type | 學位論文 ; thesis |
Format | 49 |
Page generated in 0.0018 seconds