Return to search

Open pit geomechanics and mine planning integration: design & economic assessment of a subsurface slope deformation monitoring campaign

Magíster en Minería. Ingeniero Civil de Minas / La geomecánica y planificación minera son áreas de la minería a cielo abierto íntimamente relacionadas, ya que las restricciones geomecánicas limitan al diseño minero y, así, los planes mineros factibles. El diseño y los planes mineros han de empujar los límites de lo que la geomecánica permite, para asegurar operaciones mineras competitivas y mantener un nivel de riesgo al personal y operaciones aceptable. Luego, se requiere del monitoreo geotécnico para adquirir datos de calidad que permitan un diseño minero de alto nivel.
Sin embargo, la relación entre geomecánica y planificación minera no se extiende al diseño e implementación de programas de monitoreo. En general, los programas de monitoreo de deformaciones superficiales son diseñados con posterioridad al inicio de la operación del rajo y cuando se han identificado signos de inestabilidad en la superficie de los taludes.
El monitoreo de deformaciones del subsuelo permite alertar sobre fallas en desarrollo semanas antes de que estas se hagan notar en superficie. Luego, se debería diseñar campañas de monitoreo de deformaciones del subsuelo durante el proceso de planificación minera, considerando el diseño minero en la instalación de instrumentos geotécnicos previo a la construcción de la mina. Lo que permitiría registrar el proceso de relajación del macizo a medida que la construcción progresa y adquirir datos más exhaustivos del comportamiento del macizo rocoso (antes que con monitoreo superficial), con el fin de optimizar el diseño de taludes futuros y adoptar medidas correctivas para evitar fallas.
En esta tesis, fueron diseñadas una serie de campañas de monitoreo de deformaciones del subsuelo usando In-Place Inclinometers, ShapeAccelArrays y Networked Smart Markers (NSMs) como equipos de monitoreo. Las opciones fueron aplicadas a una mina teórica desarrollada como parte de la tesis y comparadas en términos de costos, cantidad y calidad de los datos recopilados.
Los resultados indican a la opción de NSMs cada 2[m] como la más eficiente en cuanto a costos ya que: (1) presenta el menor costo por unidad de datos adquiridos (US$57.21) y (2) 5 veces mayor vida útil, lo que permitiría obtener el doble de datos que la siguiente mejor opción, (3) se financia con un aumento de 2° en el ángulo de talud y (4) aumenta el VAN del proyecto en 3.2%. / Open pit geomechanics and mine planning are two closely related areas in the development of an open pit mine since geotechnical constrains limit the possible mine designs and, thus, the feasible mine plans. Mine designs and plans have to push the limits of what rock mass geomechanics allow to assure competitive mine operations, while maintaining acceptable levels of risk to operations and personnel. Therefore, geotechnical monitoring programs are required to acquire good quality data to be used as input for mine design.
However, the relation between geomechanics and mine planning does not extend to monitoring programs design and implementation. Generally, surface deformation monitoring programs are designed after the project is in operation and signs of slope instability have been identified on the surface.
Subsurface deformation monitoring can alert about developing failures weeks before any sign of instability is noted on the surface. Therefore, subsurface deformation monitoring campaigns should be designed along the mine planning process and considering the mine s design to install geotechnical instrumentation prior to the construction of the slopes. This methodology would allow to register the rock mass relaxation process as construction progresses and to acquire more comprehensive data about rock mass behaviour, in advanced of surface monitoring, towards future slope design optimization and adoption of remedial measurements to avoid failure.
In this thesis, a series of subsurface deformation monitoring campaign were designed using In-Place Inclinometers, ShapeAccelArrays and Networked Smart Markers as monitoring devices. All options were applied to a theoretical open pit developed as part of this work. The campaigns were compared in terms of cost, quantity and quality of gathered data.
The results showed that the campaign using NSMs installed every 2 meters was the most cost-efficient option as it represented: (1) the lowest cost per unit of gathered data (US$57.21), (2) five times longer lifespan, which allowed to gather twofold the amount of data compared with the next best option, (3) be financing of the campaign through steepening of the slopes by 2° and (4) increase in project s original NPV by 3.2%.

Identiferoai:union.ndltd.org:UCHILE/oai:repositorio.uchile.cl:2250/141034
Date January 2016
CreatorsHölck Teuber, Carlos Javier
ContributorsCastro Ruiz, Raúl, Yarmuch Guzmán, Juan Luis, Widzik-Capehart, Eleonora, Read, John
PublisherUniversidad de Chile
Source SetsUniversidad de Chile
LanguageEnglish
Detected LanguageSpanish
TypeTesis
RightsAttribution-NonCommercial-NoDerivs 3.0 Chile, http://creativecommons.org/licenses/by-nc-nd/3.0/cl/

Page generated in 0.0025 seconds